• Vigor Plast India Limited.

Flush tank And Seat Cover

  • Non Corrosive
  • Resistance To chemical
  • Thogh & Reliable
  • Easy Cold Welding Process
  • Prevent Bacterial Growth
  • Low Thermal Expansion
  • life of More than 50 Years
  • For Cold water

flush tank & Seat Cover

Standred & Specification

PROPERTIES OF UPVC PIPES:

Vigor seat covers and flush tanks, like many bathroom fixtures, come with a range of properties designed to enhance comfort, durability, and functionality:

Material Quality:

Vigor seat covers and flush tanks are typically made from high-quality materials such as durable plastics (like polypropylene or ABS) or ceramics, ensuring longevity and resistance to wear and tear..

Comfort:

Seat covers are designed with ergonomic considerations to provide comfort during use. They often feature contoured shapes and smooth finishes for a comfortable seating experience.

Hygiene:

Many Vigor seat covers come with features aimed at promoting hygiene, such as antibacterial coatings or materials that are easy to clean and maintain. This helps prevent the buildup of germs and bacteria, ensuring a clean and sanitary environment.

Durability:

Vigor seat covers and flush tanks are engineered to withstand frequent use without deteriorating. They are resistant to chipping, cracking, and fading, ensuring long-term durability and performance.

Water Efficiency:

Flush tanks are designed to be water-efficient, with options for dual-flush mechanisms or low-flow settings that help conserve water while still providing effective flushing performance. This contributes to water conservation efforts and reduces water bills.

Easy Installation:

Vigor seat covers and flush tanks are typically designed for easy installation, with simple instructions and compatibility with standard plumbing fixtures. This facilitates hassle-free setup and reduces installation time and costs.

Noise Reduction:

Some flush tanks are equipped with noise-reducing features to minimize the sound of flushing, providing a quieter and more peaceful bathroom environment.

Note: Vigor CPVC pipes means unplasticised polyinylchloride pipe, also frequently referred to as rigid PVC pipe. The word rigid does not explain its structure, but denes a property, which is self explanatory.

Installation Guide

Easy and 100% leakproof installation.

Step 1: Cutting

Measure the pipe length accurately and make a visible marking using a felt tip pen. Ensure that the pipe and fittings are size compatible. You can easily cut with a plywood cutting saw/ ratchet cutter or a wheel cutter. Cutting the pipe as squarely as possible (at 90°) provides optimal bonding area within a joint. Inspect pipe ends thoroughly prior to making a joint. If a crack or splintering is noticed cut-off a minimum of 25 mm beyond the visible crack before proceeding.

Step 2: Deburring/Beveling

Burrs in and on pipe end can obstruct flow/proper contact between the pipe and socket of the fitting during assembly and should be removed from both in and outside of the pipe. A 15 mm dia half round file/a pen knife or a deburring tool are suitable for this purpose. A slight bevel on the end of the pipe will ease entry of the pipe into the socket of the fitting socket.

Step 4: Fitting Preparation

Using a clean dry rag, wipe the dirt and moisture from the fitting sockets and pipe end. Dry fit the pipe to ensure total entry into the bottom of the fittings socket and make a visible marking using a felt tip pen.

Step 5: One Step Solvent Cement Procedure

Use only Ashirvad FLOWGUARD PLUS™ CPVC Solvent cement conforming to ASTM F-493 to ensure a perfect solvent weld Joint. When making a joint, apply an even coat of solvent cement at the end of the pipe and also inside the fitting socket. Do not use thickened or lumpy solvent cement. It should have a flow consistency like that of syrup or paint.

Step 5: Assembly

Immediately insert the pipe into the fitting socket, rotate the pipe 1/4 to 1/2 turn while inserting. This motion ensures an even distribution of solvent cement within the joint. Properly align the fittings as per patented alignment system shown with picture diagram on the right side. Hold the assembly for 30 seconds to allow the joint to setup and avoid push-out.